My whole morning was spent on that a single HVAC upgrade job
Most HVAC upgrade jobs take more than 2 hours to complete… In fact, when the office manager schedules an HVAC upgrade job, she tells all of our clients that the job will take all morning, however all of us used to tell the clients more than 2 or several hours, however we ran into snags and had a lot of angry people, and now we tell most people that the job will take from morning until night.
- If we do not run into any complications at all, then we finish early and the client is happily surprised.
If we run into a single problem after another and the job takes all morning, then the client is never unhappy, but last Thursday, I was laboring on an HVAC upgrade job with a single of my co-workers; The guy was consistently on his telephone all morning long. I overheard that guy talking a single time and it was clear that he was arguing with his bestie about something, and she called 10 or 15 times and she texted him every couple of hours. I do not have any system what was going on, however it certainly made our morning a lot longer than it needed to be. If my coworker would have had his head on straight, we entirely would have finished the easy HVAC upgrade by 4. Instead, we were finishing all of the final touches as the sun was going down. I do not want to complain to my boss about the guy, despite the fact that he better get his lake house life straight or he will lose this job. My boss will not put up with someone on their PC all morning.